Public Works

Engineering / Projects

The Engineering/CIP Division is dedicated to serving the needs of the Upland Community by maintaining and improving the City’s largest assets consisting of streets, sidewalks, storm drains, water facilities, sewer mains, traffic signals, City-owned street lights, and City buildings. Our mission statement is “To plan, construct, and maintain safe and effective infrastructure which meets the present and future needs of the City.” The Engineering Division pledges to serve the community infrastructure needs by embracing 4 core values

 

CommitmentDedicated to meeting the needs of the community
Fiscal Responsibility

Conscientious use of public funds

ExcellenceDevote ourselves to a work ethic of unsurpassed excellence
QualityProvide the technical resources to ensure that public and private improvements are safe, reliable,  and constructed to quality standards

 

The Engineering Division provides the planning, design, bidding, construction management, and inspection for all City-sponsored improvement projects within the public right-of-way. Typical work includes the following:

  • Maintaining over 209 centerline miles of pavement within the City.
  • Rehabilitate existing street pavements, sidewalks, curb ramps, curb and gutter, and related appurtenances throughout the City.
  • Construct new water mains, wells, and treatment facilities.
  • Maintain 83 traffic signals within the City.
  • Repair and construct storm drain improvements throughout the City.
  • Serve as the liaison with Caltrans, San Bernardino County Transit Authority, San Bernardino County / Flood Control District, and the U.S. Army Corps of Engineers.

Alley Improvement Master Plan

 This Master Plan was adopted by Council in September 2017. The plan will require 48 years to reconstruct 19.5 miles of alleys with the remaining 17.5 miles of alleys are scheduled to receive slurry seal coat every 10 years. The first round of slurry will be distributed over Years 1, 2, & 3, and repeat in Years 10, 20, 30, & 40.

Below are the two maps which indicate which alleys are to be slurried and which alleys are to be reconstructed along with the corresponding assigned year in the Improvement Master Plan. 

We are currently in Year 6 for reconstruction and working on Year 3 for slurry. 